Chilled Water System Installation, Pressure Testing, Insulation and Cladding

On this page you can find method statement for chilled water system installation, pressure testing, insulation and cladding. By following this method of statement hvac contractor shall comply with standard requirements for installation, pressure testing, insulation and cladding of chilled water piping network including valves and accessories. Following the the guidelines contained herein installer shall… Read More »

Electric Water Heater Installation Method Statement

The purpose of generating this method statement is to define stepwise procedure for electric water heater installation. By following and implementing this electrical water heater installation method statement, contractor shall ensure that the job execution complies with the project requirements and serves the intended function to client satisfaction. Overall project plumbing engineer and supervisor are… Read More »

Field Joint Insulation Method for Pre Insulated Chilled Water Pipe

Below is a precise hvac method statement covering Field Joint Insulation of Pre Insulated Chilled Water Pipe. Insulation works shall be performed by experienced technician / insulator in order to achieve maximum insulation efficiency of the filed joints on chilled water piping system. Necessary Tools & Equipment Following tools and equipment shall be arranged before… Read More »

UPS Installation Procedure

Below you can find a precise procedure that gives steps for installation of uninterruptible power supply UPS system. Installer shall make sure that UPS installation is done as per the installation manual provided by the manufacturer. A dedicated separate method statement may be required by the consultant or client in order to ensure the compliance… Read More »

Fire Alarm System Installation Method Statement

The purpose this method statement is to define the steps for installation of Fire Alarm System. By following this procedure installation contractor shall ensure that the job execution complies with the project requirements and serves the intended function to the satisfaction of the client. Method Statement covers complete process from material receiving to installation and… Read More »

Earthing, Bonding & Lightning Protection System Installation Method Statement

The purpose of this Method Statement is to define the procedures, responsibilities, quality requirements, inspection criteria, testing requirements, and safety measures for the installation of the Lightning Protection System (LPS). The objective is to ensure that the Lightning Protection System is installed safely and in accordance with approved shop drawings, project specifications, risk assessment reports,… Read More »

Fan Coil Unit FCU Installation Method Statement

This method statement applies to Fan Coil Units and associated valve package and controls, as per the project mechanical HVAC specifications. Purpose of this method statement is to outline the method of storage, handling and installation of fan coil units, valve package and controls. Required Materials Fan Coil Units. Gate valves, 2 way control valves,… Read More »

Cable Tray Installation Method Statement

Below is given a detailed cable tray installation method statement which is part of electrical cable management system on a project site. This method statement covers the installation of cable management system including cable tray, cable ladder, cable trunking and all the relevant accessories. All the electrical cable tray installation on the project shall be… Read More »

Diesel Generator Installation Method of Statement

TABLE OF CONTENTS SCOPE This procedure is developed for safe and secure supply and installations of diesel generator set for any kind of the project, document details diesel generator installation including: DEFINITIONS PQP: Project Quality Plan PSP: Project Safety Plan QCP: Quality Control Procedure HSE: Health, Safety and Environment MS: Method Statement ITP: Inspection Test… Read More »