Category Archives: Civil Work Method Statement

Parapet Construction Civil Method Statement

1. Scope This method statement is developed and issued to describe the procedure for parapet construction works to ensure that the work is planned and performed in accordance with technical specification and drawings. 2. Responsibilities The Project Manager will be responsible for global activities The work will be carried out under the responsibility of Construction… Read More »

Gabion Wall Retaining Wall Construction Method Statement

This method statement covers supply and installation of gabions along the top of cut slopes to divert and filter upland runoff where indicated on the drawings. These will be installed ahead of major earthwork operations to minimize potential for washout of cut slopes both during the construction phase and permanently thereafter. Such work will be… Read More »