Category Archives: Mechanical Method Statement

Chilled Water System Installation, Pressure Testing, Insulation and Cladding

On this page you can find method statement for chilled water system installation, pressure testing, insulation and cladding. By following this method of statement hvac contractor shall comply with standard requirements for installation, pressure testing, insulation and cladding of chilled water piping network including valves and accessories. Following the the guidelines contained herein installer shall… Read More »

Field Joint Insulation Method for Pre Insulated Chilled Water Pipe

Below is a precise hvac method statement covering Field Joint Insulation of Pre Insulated Chilled Water Pipe. Insulation works shall be performed by experienced technician / insulator in order to achieve maximum insulation efficiency of the filed joints on chilled water piping system. Necessary Tools & Equipment Following tools and equipment shall be arranged before… Read More »

Fan Coil Unit FCU Installation Method Statement

This method statement applies to Fan Coil Units and associated valve package and controls, as per the project mechanical HVAC specifications. Purpose of this method statement is to outline the method of storage, handling and installation of fan coil units, valve package and controls. Required Materials Fan Coil Units. Gate valves, 2 way control valves,… Read More »

Fuel and Lube Trucks Safe Work Operating Procedure

This safe work instruction outlines the safe operation of fuel and lube trucks used on a construction work site, this standard method must be followed by all fuel and lube truck drivers working on project work sites. Overall project manager is having responsibilities for the implementation of this standard safety procedure. General Requirements Fuel &… Read More »

Installation Method Statement for Settling Tank Shells Using Jack Lifting Method

The purpose of this method statement is to explain the various steps involved in lifting the Settling Tank shells by Jack Lifting Method. Prepare work permits, JSA and working procedure for approval prior to commencing work. Organize job safety meeting with all concerned to brief the planned work activities and discuss their associated risks. All… Read More »