Cable Tray Installation Method Statement

Below is given a detailed cable tray installation method statement which is part of electrical cable management system on a project site. This method statement covers the installation of cable management system including cable tray, cable ladder, cable trunking and all the relevant accessories. All the electrical cable tray installation on the project shall be… Read More »

Diesel Generator Installation Method of Statement

TABLE OF CONTENTS SCOPE This procedure is developed for safe and secure supply and installations of diesel generator set for any kind of the project, document details diesel generator installation including: DEFINITIONS PQP: Project Quality Plan PSP: Project Safety Plan QCP: Quality Control Procedure HSE: Health, Safety and Environment MS: Method Statement ITP: Inspection Test… Read More »

General Electrical Installation and Testing Requirements

Below electrical method statement briefly describes the installation and testing general requirements on a construction project. By following below method statement the contractor shall ensure that all the installation works are done as per project specifications and applicable codes and standards. Below is list of necessary materials tools and equipment’s for the installation and testing:… Read More »

Emergency Lighting System Installation Method of Statement

This electrical installation method statement details the method of installation of Emergency Lighting System, as per project electrical specifications. A separate Method Statement shall be submitted for testing and commissioning of the Emergency Lighting System. All materials shall be as per approved material submittals (schedule of materials is attached with method statement). Sizes of FP200… Read More »

BMS Installation Testing and Commissioning Method of Statement

Below is a precise mechanical method of statement that covers installation, testing and commissioning of Building Management System BMS to ensure that the site installation work execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools: Standard electrician & wireman tools Portable hand tools Spirit Level / Level Threads… Read More »