Gabion Wall Retaining Wall Construction Method Statement

This method statement covers supply and installation of gabions along the top of cut slopes to divert and filter upland runoff where indicated on the drawings. These will be installed ahead of major earthwork operations to minimize potential for washout of cut slopes both during the construction phase and permanently thereafter. Such work will be… Read More »

PTFE NPT Piping System Installation Method of Statement

The following information is intended to assist users of the PTFE NPT Piping System in achieving trouble free installation of system components using the any available installation Tool Kit. This method statement covers the following aspects of installation: Cutting and Chamfering Pipe Threading Pipe Joints Using PTFE Based Paste Sealant Joints Using Thread Seal Tape… Read More »

Fire Sprinkler System Installation including Accessories

This method statement describes the procedure for the installation of fire protection services on a project. The work methodology covers following activities: Pipe Hanger Installation Flanged Fittings Installation Valve with Screw Connection Installation Valve with Flanged End Connection Installation Flow Switch Installation Screw Fittings Installation Sprinkler Head (with ceiling) Installation Sprinkler Head (without ceiling) Installation… Read More »

Boiler Installation and Testing Method of Statement

Purpose of generating this method of statement is to define the procedure step by step to implement the correct practices for installation and testing of Steam Boilers through the guidelines contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. This Method Statement… Read More »

Doors and Windows Installation Method of Statement

This method statement describes the procedure and method of installation Doors and Windows for a project. The installation works shall be in accordance with the project specifications, approved drawings and manufacturer instructions. All doors and windows shall be wrapped in plastic covers while delivery and transportation. Store doors and windows in clean, ventilated and dry… Read More »

Gypsum Partition Drywall Installation Method Statement

This method statement provides the control sequence and methodology that will be used for the construction of drywall installation, Gypsum Partition, Lining and Ceiling in order to achieve compliance with the contract specifications and drawing. The principle of this document is to ensure that all methods and stages for the construction of gypsum partition and… Read More »

Underground Drainage Piping

This plumbing method statement covers the installation of Sanitary, Vent and Storm drainage piping installation. By following and implementing this procedure contractor shall ensure that drainage and vent piping have been installed as per the contract requirements and project specifications. Required Materials PVC Pipe & Fittings Ductile Pipe & Fittings Cast Iron Pipe & Fittings… Read More »

Site Clearing & Site Preparation Method of Statement

This method statement is to define the method of site clearing works and removal of debris found in the course of clearing works. Site clearing shall be carried out before proceeding with any site storage or earth works or other permanent works. Site preparation: Removal and disposal of trees (Girth not exceeding 500mm and height… Read More »

Cut and Fill Earthworks Method of Statement

This civil work method statement outlines the construction of earthwork excavation and embankment and the logistic requirements such as access road for movement of dump truck to and at the excavated area. The scopes of this method statement are listed below. Setting Out Site Preparation Excavation & Backfilling Compaction Sampling & testing Temporary Drain &… Read More »

Site Clearance and Top Soil Removal Method of Statement

This method of statement outlines the procedure and methodology for site clearance works and topsoil stripping including removal/demolition of existing buildings, road signage and trees which interfere with the new road alignment. Site Clearance & Topsoil Stripping All personnel entering the site shall have received a site safety induction and have attended a job toolbox… Read More »