Category Archives: Civil Work Method Statement

Parapet Construction Civil Method Statement

1. Scope This method statement is developed and issued to describe the procedure for parapet construction works to ensure that the work is planned and performed in accordance with technical specification and drawings. 2. Responsibilities The Project Manager will be responsible for global activities The work will be carried out under the responsibility of Construction… Read More »

Gabion Wall Retaining Wall Construction Method Statement

This method statement covers supply and installation of gabions along the top of cut slopes to divert and filter upland runoff where indicated on the drawings. These will be installed ahead of major earthwork operations to minimize potential for washout of cut slopes both during the construction phase and permanently thereafter. Such work will be… Read More »

Doors and Windows Installation Method of Statement

This method statement describes the procedure and method of installation Doors and Windows for a project. The installation works shall be in accordance with the project specifications, approved drawings and manufacturer instructions. All doors and windows shall be wrapped in plastic covers while delivery and transportation. Store doors and windows in clean, ventilated and dry… Read More »

Gypsum Partition Drywall Installation Method Statement

This method statement provides the control sequence and methodology that will be used for the construction of drywall installation, Gypsum Partition, Lining and Ceiling in order to achieve compliance with the contract specifications and drawing. The principle of this document is to ensure that all methods and stages for the construction of gypsum partition and… Read More »

Site Clearing & Site Preparation Method of Statement

This method statement is to define the method of site clearing works and removal of debris found in the course of clearing works. Site clearing shall be carried out before proceeding with any site storage or earth works or other permanent works. Site preparation: Removal and disposal of trees (Girth not exceeding 500mm and height… Read More »

Cut and Fill Earthworks Method of Statement

This civil work method statement outlines the construction of earthwork excavation and embankment and the logistic requirements such as access road for movement of dump truck to and at the excavated area. The scopes of this method statement are listed below. Setting Out Site Preparation Excavation & Backfilling Compaction Sampling & testing Temporary Drain &… Read More »

Site Clearance and Top Soil Removal Method of Statement

This method of statement outlines the procedure and methodology for site clearance works and topsoil stripping including removal/demolition of existing buildings, road signage and trees which interfere with the new road alignment. Site Clearance & Topsoil Stripping All personnel entering the site shall have received a site safety induction and have attended a job toolbox… Read More »

GRC Construction / Manufacturing Installation Method of Statement

Glass fiber Reinforced Concrete (GRC) is the term applied to products manufactured using a mortar of hydraulic cement and fine aggregate reinforced throughout with alkali resistant glass fibers. The fiber contents are typically 3% to 5% by weight, cement ratio of up to 1:1, a GRC material may therefore be tailored to meet the requirements… Read More »

GFRC Concrete Fixation Method of Statement

Table of Content 1 . Scope 2. Purpose 3. References 4. Materials 5. Procedures 6. Repair and joint treatment 7. Materials characteristics 8. Inspection 9. Attachments. 1. Scope Scope of this method of statement covers the manufacturing GFRC covers, joint treatment & repairs for GFRC, this method of statement could be extended to other area… Read More »