Category Archives: Civil Work Method Statement

GFRC Concrete Fixation Method of Statement

Table of Content 1 . Scope 2. Purpose 3. References 4. Materials 5. Procedures 6. Repair and joint treatment 7. Materials characteristics 8. Inspection 9. Attachments. 1. Scope Scope of this method of statement covers the manufacturing GFRC covers, joint treatment & repairs for GFRC, this method of statement could be extended to other area… Read More »

Doors and Windows Installation Method of Statement

This method statement describes the procedure and method of installation Doors and Windows for a project. The installation works shall be in accordance with the project specifications, approved drawings and manufacturer instructions. All doors and windows shall be wrapped in plastic covers while delivery and transportation. Store doors and windows in clean, ventilated and dry… Read More »

GRC Construction / Manufacturing Installation Method of Statement

Glass fiber Reinforced Concrete (GRC) is the term applied to products manufactured using a mortar of hydraulic cement and fine aggregate reinforced throughout with alkali resistant glass fibers. The fiber contents are typically 3% to 5% by weight, cement ratio of up to 1:1, a GRC material may therefore be tailored to meet the requirements… Read More »

Site Clearance and Top Soil Removal Method of Statement

This method of statement outlines the procedure and methodology for site clearance works and topsoil stripping including removal/demolition of existing buildings, road signage and trees which interfere with the new road alignment. Site Clearance & Topsoil Stripping All personnel entering the site shall have received a site safety induction and have attended a job toolbox… Read More »

Gypsum Partition Drywall Installation Method Statement

This method statement provides the control sequence and methodology that will be used for the construction of drywall installation, Gypsum Partition, Lining and Ceiling in order to achieve compliance with the contract specifications and drawing. The principle of this document is to ensure that all methods and stages for the construction of gypsum partition and… Read More »

Site Clearing & Site Preparation Method of Statement

This method statement is to define the method of site clearing works and removal of debris found in the course of clearing works. Site clearing shall be carried out before proceeding with any site storage or earth works or other permanent works. Site preparation: Removal and disposal of trees (Girth not exceeding 500mm and height… Read More »

Cut and Fill Earthworks Method of Statement

This civil work method statement outlines the construction of earthwork excavation and embankment and the logistic requirements such as access road for movement of dump truck to and at the excavated area. The scopes of this method statement are listed below. Setting Out Site Preparation Excavation & Backfilling Compaction Sampling & testing Temporary Drain &… Read More »

Method Statement for Steel Structure Installation

The purpose of this steel structure installation method statement is to ensure the proper management for the erection work on customer job site safely, correctly and complying with applicable standards. Applicable international code is “Code of Standard Practices for Steel Building and Bridges section 7 “ issued by American Institute of Steel Construction (AISC). Additionally… Read More »

Quay Wall Construction Method Statement

This method statement covers the construction of quay wall identified on the project drawings as per the employer’s requirements, with cope at 3.35 m CD, having a design depth of -12.5m CD including foundation works and anti scour protection below -12.5m CD level, tying-in with the existing quay walls and complete with navigation, berthing and… Read More »

Sheet Pile Retaining Wall Installation Method Statement

This method statement details the proposed works connected with the off loading, loading and installation of sheet pile retaining wall using a 25tn excavator and Movax vibratory pile drivers unit to construct a retaining wall at the project. The purpose of this method statement is to identify potential hazards and to provide a safe and… Read More »