Category Archives: Civil Work Method Statement

Method Statement for External Plaster Works

The purpose of this civil method statement is to define the procedure for the preparation and application of cement plaster works that shall receive acrylic epoxy paint to the external elevations of the buildings. This method statement is applicable to the plastering work at all external elevations including the balcony walls of the buildings. Material… Read More »

Tile Installation | Hard Floor Installation Method Statement

Below is a precise civil work method statement that covers the tile installation procedure for ceramic walls, floors, skirting, up stands etc. at locations shown on the drawings and schedules in accordance with the project requirements specified in the relevant specifications, procedures and drawings, considering safety of workers and quality of the work activities. Method… Read More »

Safe Excavation and Trenching Methods & Guidelines

The purpose of this occupational health and safety procedure is to establish generic instructions and guidelines for carrying out excavations and trenching activities at the construction project site. Project manager and health and safety department is primarily responsible for the implementation of this safety work instruction in coordination with competent persons, all site personnel and… Read More »

Method Statement for Scaffolding Installation

Below is a precise scaffolding method statement, purpose of this document is to provide instruction for the installation, erection and use of scaffolding or formworks for multiple purposes applicable for any kind and size of project. All scaffolds in excess of 10m in height need to be specially designed, as do sheeted scaffolds exceeding 5m… Read More »

Download Project Quality Plan PQP With All Forms

Now you can download complete project quality plan or PQP that can be used for any project especially for construction project for quality planning purposes. This PQP document will help you qualify for a project and satisfy client requirements as well. Most importantly if your company is ISO 9001:2015 QMS Certified then you must prepare… Read More »

Parapet Construction Civil Method Statement

1. Scope This method statement is developed and issued to describe the procedure for parapet construction works to ensure that the work is planned and performed in accordance with technical specification and drawings. 2. Responsibilities The Project Manager will be responsible for global activities The work will be carried out under the responsibility of Construction… Read More »

Gabion Wall Retaining Wall Construction Method Statement

This method statement covers supply and installation of gabions along the top of cut slopes to divert and filter upland runoff where indicated on the drawings. These will be installed ahead of major earthwork operations to minimize potential for washout of cut slopes both during the construction phase and permanently thereafter. Such work will be… Read More »