Site Clearance and Top Soil Removal Method of Statement

This method of statement outlines the procedure and methodology for site clearance works and topsoil stripping including removal/demolition of existing buildings, road signage and trees which interfere with the new road alignment. Site Clearance & Topsoil Stripping All personnel entering the site shall have received a site safety induction and have attended a job toolbox… Read More »

GRC Construction / Manufacturing Installation Method of Statement

Glass fiber Reinforced Concrete (GRC) is the term applied to products manufactured using a mortar of hydraulic cement and fine aggregate reinforced throughout with alkali resistant glass fibers. The fiber contents are typically 3% to 5% by weight, cement ratio of up to 1:1, a GRC material may therefore be tailored to meet the requirements… Read More »

GFRC Concrete Fixation Method of Statement

Table of Content 1 . Scope 2. Purpose 3. References 4. Materials 5. Procedures 6. Repair and joint treatment 7. Materials characteristics 8. Inspection 9. Attachments. 1. Scope Scope of this method of statement covers the manufacturing GFRC covers, joint treatment & repairs for GFRC, this method of statement could be extended to other area… Read More »

Diesel Generator Installation Method of Statement

TABLE OF CONTENTS SCOPE This procedure is developed for safe and secure supply and installations of diesel generator set for any kind of the project, document details diesel generator installation including: DEFINITIONS PQP: Project Quality Plan PSP: Project Safety Plan QCP: Quality Control Procedure HSE: Health, Safety and Environment MS: Method Statement ITP: Inspection Test… Read More »