Gabion Wall Retaining Wall Construction Method Statement

This method statement covers supply and installation of gabions along the top of cut slopes to divert and filter upland runoff where indicated on the drawings. These will be installed ahead of major earthwork operations to minimize potential for washout of cut slopes both during the construction phase and permanently thereafter. Such work will be… Read More »

PTFE NPT Piping System Installation Method of Statement

The following information is intended to assist users of the PTFE NPT Piping System in achieving trouble free installation of system components using the any available installation Tool Kit. This method statement covers the following aspects of installation: Cutting and Chamfering Pipe Threading Pipe Joints Using PTFE Based Paste Sealant Joints Using Thread Seal Tape… Read More »

Fire Sprinkler System Installation including Accessories

This method statement describes the procedure for the installation of fire protection services on a project. The work methodology covers following activities: Pipe Hanger Installation Flanged Fittings Installation Valve with Screw Connection Installation Valve with Flanged End Connection Installation Flow Switch Installation Screw Fittings Installation Sprinkler Head (with ceiling) Installation Sprinkler Head (without ceiling) Installation… Read More »

Boiler Installation and Testing Method of Statement

Purpose of generating this method of statement is to define the procedure step by step to implement the correct practices for installation and testing of Steam Boilers through the guidelines contained herein so as to ensure that the job execution complies with the requirements and serves the intended function to satisfactory level. This Method Statement… Read More »