Author Archives: Webmaster

GRC Construction / Manufacturing Installation Method of Statement

Glass fiber Reinforced Concrete (GRC) is the term applied to products manufactured using a mortar of hydraulic cement and fine aggregate reinforced throughout with alkali resistant glass fibers. The fiber contents are typically 3% to 5% by weight, cement ratio of up to 1:1, a GRC material may therefore be tailored to meet the requirements… Read More »

Site Clearance and Top Soil Removal Method of Statement

This method of statement outlines the procedure and methodology for site clearance works and topsoil stripping including removal/demolition of existing buildings, road signage and trees which interfere with the new road alignment. Site Clearance & Topsoil Stripping All personnel entering the site shall have received a site safety induction and have attended a job toolbox… Read More »

Gypsum Partition Drywall Installation Method Statement

This method statement provides the control sequence and methodology that will be used for the construction of drywall installation, Gypsum Partition, Lining and Ceiling in order to achieve compliance with the contract specifications and drawing. The principle of this document is to ensure that all methods and stages for the construction of gypsum partition and… Read More »

Site Clearing & Site Preparation Method of Statement

This method statement is to define the method of site clearing works and removal of debris found in the course of clearing works. Site clearing shall be carried out before proceeding with any site storage or earth works or other permanent works. Site preparation: Removal and disposal of trees (Girth not exceeding 500mm and height… Read More »

Fuel and Lube Trucks Safe Work Operating Procedure

This safe work instruction outlines the safe operation of fuel and lube trucks used on a construction work site, this standard method must be followed by all fuel and lube truck drivers working on project work sites. Overall project manager is having responsibilities for the implementation of this standard safety procedure. General Requirements Fuel &… Read More »

Cut and Fill Earthworks Method of Statement

This civil work method statement outlines the construction of earthwork excavation and embankment and the logistic requirements such as access road for movement of dump truck to and at the excavated area. The scopes of this method statement are listed below. Setting Out Site Preparation Excavation & Backfilling Compaction Sampling & testing Temporary Drain &… Read More »

Fire Extinguishers Maintenance Work Instruction

The purpose of this instruction is to provide guidelines for the location and inspection of fire extinguishers on a project site and / or in a building. Project HSE officer is overall responsible for the implementation of this standard HSE procedure. Responsibilities It is the responsibility of each department head to ensure that areas and… Read More »

Hand Arm Vibration Minimizing Standard Work Instruction

This standard work instruction is developed to assist work force in mitigating vibration hazards on a construction project site to minimize the risk of hand arm vibration syndrome. Overall project HSE team is responsible for the implementation of this standard procedure. Hazard Identification and Risk Assessment Repeated exposure to high levels of vibration is potentially… Read More »

Method Statement for Steel Structure Installation

The purpose of this steel structure installation method statement is to ensure the proper management for the erection work on customer job site safely, correctly and complying with applicable standards. Applicable international code is “Code of Standard Practices for Steel Building and Bridges section 7 “ issued by American Institute of Steel Construction (AISC). Additionally… Read More »

Underground Drainage Piping

This plumbing method statement covers the installation of Sanitary, Vent and Storm drainage piping installation. By following and implementing this procedure contractor shall ensure that drainage and vent piping have been installed as per the contract requirements and project specifications. Required Materials PVC Pipe & Fittings Ductile Pipe & Fittings Cast Iron Pipe & Fittings… Read More »